{"id":1755,"date":"2010-01-29T21:53:20","date_gmt":"2010-01-29T21:53:20","guid":{"rendered":"https:\/\/vkkneu.mmd-stuttgart.de\/?p=1755"},"modified":"2025-06-04T14:23:59","modified_gmt":"2025-06-04T12:23:59","slug":"hot-steam-generator-system-for-the-supply-of-an-industrial-power-plant-in-north-rhine-westphalia","status":"publish","type":"post","link":"https:\/\/vkkstandardkessel.de\/en\/heissdampferzeugeranlage-zur-versorgung-eines-industriekraftwerks-in-nordrhein-westfalen\/","title":{"rendered":"Superheated steam generator system to supply an industrial power plant in North Rhine-Westphalia"},"content":{"rendered":"<h2>REALISED PRODUCTS AND SERVICES<\/h2>\n<ul>\n<li>2 high-pressure steam boilers as superheated steam generators with superheater 30 t\/h, 22 bar, 385 \u00b0C, controlled over the entire load range<\/li>\n<li>Heating oil firing<\/li>\n<li>Thermal water treatment<\/li>\n<li>Complete flue gas discharge with two-pass chimney 70 m<\/li>\n<li>New construction of a boiler house in lightweight steel construction, incl. ventilation and extraction<\/li>\n<li>Redundant design of all control and regulation components, including safety technology<\/li>\n<li>Pipework for the new plant up to the connection points in the existing power station building<\/li>\n<li>Power plant control system, safety-orientated and highly available, with connection to the unit control room<\/li>\n<li>Authorisation and implementation planning<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>UMGESETZTE PRODUKTE UND DIENSTLEISTUNGEN 2 Hochdruckdampfkessel als Hei\u00dfdampferzeuger mit \u00dcberhitzer 30 t\/h, 22 bar, 385 \u00b0C, im gesamten Lastbereich geregelt Heiz\u00f6lfeuerung Thermische Wasseraufbereitung Komplette Rauchgasabf\u00fchrung mit zweiz\u00fcgigem Kamin 70 m Neubau eines Kesselhauses in Stahlleichtbauweise, inkl. Be- und Entl\u00fcftung Redundante Ausf\u00fchrung aller Steuer- und Regelungskomponenten, inkl. Sicherheitstechnik Verrohrung der Neuanlage bis zu den Anbindestellen im [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1758,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-1755","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energieversorgung"],"_links":{"self":[{"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/posts\/1755","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/comments?post=1755"}],"version-history":[{"count":1,"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/posts\/1755\/revisions"}],"predecessor-version":[{"id":279575,"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/posts\/1755\/revisions\/279575"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/media\/1758"}],"wp:attachment":[{"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/media?parent=1755"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/categories?post=1755"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/tags?post=1755"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}