{"id":1722,"date":"2013-01-29T21:21:12","date_gmt":"2013-01-29T21:21:12","guid":{"rendered":"https:\/\/vkkneu.mmd-stuttgart.de\/?p=1722"},"modified":"2025-06-04T14:22:38","modified_gmt":"2025-06-04T12:22:38","slug":"renovation-of-the-steam-and-hot-water-supply-of-a-brewery","status":"publish","type":"post","link":"https:\/\/vkkstandardkessel.de\/en\/erneuerung-der-dampf-und-heisswasserversorgung-einer-brauerei\/","title":{"rendered":"Renewal of the steam and hot water supply of a brewery"},"content":{"rendered":"<h2>REALISED PRODUCTS AND SERVICES<\/h2>\n<ul>\n<li>1 steam boiler 3 MW for simultaneous operation of hot water and steam extraction using waste heat from a CHP module<\/li>\n<li>Low NOx heating oil\/natural gas firing<\/li>\n<li>CHP module 385 KWel<\/li>\n<li>Flue gas discharge for CHP and boiler<\/li>\n<li>Thermal water treatment<\/li>\n<li>Hot water circulation pump with speed control<\/li>\n<li>Replacement of hot water distributor with fittings<\/li>\n<li>Heat storage for heating networks<\/li>\n<li>Heat exchanger system for efficient utilisation of CHP and boiler waste heat<\/li>\n<li>Pipework inside the boiler house<\/li>\n<li>Electrical, control and instrumentation technology<\/li>\n<li>Authorisation and implementation planning<\/li>\n<\/ul>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>UMGESETZTE PRODUKTE UND DIENSTLEISTUNGEN 1 Dampfkessel 3 MW zum gleichzeitigen Betrieb von Hei\u00dfwasser- und Dampfentnahme unter Nutzung der Abw\u00e4rme aus einem BHKW-Modul NOx-arme Heiz\u00f6l-\/Erdgasfeuerung BHKW-Modul 385 KWel Rauchgasabf\u00fchrung f\u00fcr BHKW und Kessel Thermische Wasseraufbereitung Hei\u00dfwasserumw\u00e4lzpumpe mit Drehzahlregelung Erneuerung Hei\u00dfwasserverteiler mit Armaturen W\u00e4rmespeicher f\u00fcr Heizungsnetze W\u00e4rmetauschersystem zur effizienten Nutzung der BHKW- und Kesselabw\u00e4rme Verrohrung innerhalb des [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1723,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-1722","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-brauereiwirtschaft"],"_links":{"self":[{"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/posts\/1722","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/comments?post=1722"}],"version-history":[{"count":1,"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/posts\/1722\/revisions"}],"predecessor-version":[{"id":279569,"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/posts\/1722\/revisions\/279569"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/media\/1723"}],"wp:attachment":[{"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/media?parent=1722"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/categories?post=1722"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vkkstandardkessel.de\/en\/wp-json\/wp\/v2\/tags?post=1722"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}